Our work shapes the State. Here are some projects you'll see us currently completing in the near future.

 
Colrain Spring of 2016, E.T.& L. Corp. was awarded a $9.5 million, multi-span bridge project in Colrain, MA. The project consists of replacing the existing Jacksonville Road Bridge over the North River, as well as the reconstruction of a portion of Jacksonville Road. The existing bridge has 5 spans with a total length of 275 feet and will be replaced by a 4 span, 302 foot length structure with new concrete abutments and piers. The work will be constructed in two stages, with one lane of…
E.T.& L. Corp. is currently working on replacing the existing 3.5 million gallon steel plate water storage tank at Indian Head Heights for the Town of Framingham, MA. The $6.4 million contract includes the demolition of the existing 3.5 million gallon water tank which will be replaced by two 1.75 million gallon precast concrete water tanks. The project also includes lead soil removal and disposal, a SCADA communication structure, altitude valve vault, site work, landscaping, 16” water main…
E.T.& L. Corp. has been subcontracted to perform sitework for a new gas company training facility in Shrewsbury. The contract, totaling $5 million, includes clearing and grubbing of the area, stripping topsoil, site cuts and fills of 180,000 cy, rip rap slope stabilization, furnishing and installing gravel for sidewalks and bituminous paving base, and furnishing and installing the site drainage system and concrete curb. Construction of the training center's foundation will begin in April…
In September of 2016, E.T.& L. Corp. was the low bidder on a major site project in Marlborough, MA. The $11,000,000.00 project for Walker Realty, LLC is to prepare the site for the construction of the Apex Center, a state-of-the-art entertainment complex. Preparation of the site for construction includes installation of a sewer system, water system, excavation and backfill for both electric and gas lines, pavement of roadway, parking, and sidewalks, and excavation and backfill of building…
In December of 2015, E.T.& L. Corp was awarded a $4.8 Million project by the Massachusetts Department of Transportation to build phase II of the Clipper City Rail Trail. This project is part of the development of the Border to Boston Trail, the Coastal Trails Coalition, and the much larger vision of the East Coast Greenway, which seek to expand these systems of bicycle and pedestrian trails as alternative transportation links to town centers, schools, businesses and amenities, and public…
The Methuen Rotary Reconstruction Project includes replacing the Route 110, Route 113, and I-93 Rotary in Methuen to alleviate significant congestion and safety concerns.  The project will replace the existing rotary with a partial cloverleaf interchange; will build or realign four ramps; build new I-93 loop ramps; realign Route 110/113; build new signalized intersections east and west of the interchange; and improve conditions for pedestrians and cyclists. This $56 million MassDOT project is…