Signature Projects

Body

Below are our signature projects.

 
In 2007, E.T.& L. completed its largest project to date: a $37 million grade-separated interchange replacing the Sagamore Bridge Rotary, infamous for causing terrible traffic on and off the popular vacation destination of Cape Cod. The project essentially lowered Route 6 (Scenic Highway) below Route 3 and constructed a new Route 3 bridge, thus streamlining travel to the Cape. In order to allow traffic to flow during construction, three (3) temporary bridges were erected to carry travelers…
Just below the northern slope of Mount Greylock lies the 4,300 foot Runway 11-29 at the Harriman & West Airport in North Adams, Massachusetts. E.T.& L. Corp. was awarded a $6 million contract to reconstruct the full runway in 2010. Existing taxiway stubs were also relocated to new locations, a new airfield lighting system was installed, and an extended runway safety area was constructed. The completed runway was reopened on September 30, 2010, one day ahead of the required 110-day…
May of 2010 brought E.T.& L. Corp. its first Design Build project with CSX Bridge Bundle #3. E.T.& L. is the managing partner in a joint venture with J.F. White Contracting Company for this project for the Massachusetts Department of Transportation. Bridge Bundle #3 is part of a comprehensive statewide project to raise bridges and, in some locations, undercut the railroad tracks, so that CSX can run their double stack freight trains in and out of Massachusetts. The two year project…