In January of 2018, E.T.& L. Corp. was low bidder on a $2.1 million project to replace the Mill Street bridge over the Mill River in Amherst, MA. This project includes the removal and disposal of the existing bridge foundations and bridge superstructure and constructing a new 37’-6” long single span bridge carrying one, one-way vehicle lane and one multi-use path. The project also includes installation of channel scour protection, minor adjustments to the horizontal and vertical roadway…
Spring of 2018, E.T.& L. Corp. was awarded a $600,000 job in Southwick, MA to replace the Shurtleff Brook Bridge on North Loomis Street. The bridge, which was originally constructed in or around 1914, was found to have several deficiencies at the time of its most recent inspection, and will be replaced with a new bridge that will meet federal and state guidelines. The new bridge will accommodate 2-way vehicular traffic, with shoulders for pedestrian and bicycle traffic. The bridge…
Colrain Spring of 2016, E.T.& L. Corp. was awarded a $9.5 million, multi-span bridge project in Colrain, MA. The project consists of replacing the existing Jacksonville Road Bridge over the North River, as well as the reconstruction of a portion of Jacksonville Road. The existing bridge has 5 spans with a total length of 275 feet and will be replaced by a 4 span, 302 foot length structure with new concrete abutments and piers. The work will be constructed in two stages, with one lane of…
E.T.& L. Corp. is currently working on replacing the existing 3.5 million gallon steel plate water storage tank at Indian Head Heights for the Town of Framingham, MA. The $6.4 million contract includes the demolition of the existing 3.5 million gallon water tank which will be replaced by two 1.75 million gallon precast concrete water tanks. The project also includes lead soil removal and disposal, a SCADA communication structure, altitude valve vault, site work, landscaping, 16” water main…
E.T.& L. Corp. has been subcontracted to perform sitework for a new gas company training facility in Shrewsbury. The contract, totaling $5 million, includes clearing and grubbing of the area, stripping topsoil, site cuts and fills of 180,000 cy, rip rap slope stabilization, furnishing and installing gravel for sidewalks and bituminous paving base, and furnishing and installing the site drainage system and concrete curb. Construction of the training center's foundation will begin in April…
In September of 2016, E.T.& L. Corp. was awarded a $1.6 million contract by the City of Northampton. The contract is for the reconstruction of the River Road retaining wall and a portion of the supported roadway. River Road runs adjacent to Mill River and contains the Town of Williamsburg's sanitary sewer interceptor line. The project includes demolition of the existing retaining wall and roadway, construction of a new storm drainage system, construction of a new cast-in-place reinforced…
In September of 2016, E.T.& L. Corp. was the low bidder on a major site project in Marlborough, MA. The $11,000,000.00 project for Walker Realty, LLC is to prepare the site for the construction of the Apex Center, a state-of-the-art entertainment complex. Preparation of the site for construction includes installation of a sewer system, water system, excavation and backfill for both electric and gas lines, pavement of roadway, parking, and sidewalks, and excavation and backfill of building…
In December of 2015, E.T.& L. Corp was awarded a $4.8 Million project by the Massachusetts Department of Transportation to build phase II of the Clipper City Rail Trail. This project is part of the development of the Border to Boston Trail, the Coastal Trails Coalition, and the much larger vision of the East Coast Greenway, which seek to expand these systems of bicycle and pedestrian trails as alternative transportation links to town centers, schools, businesses and amenities, and public…
The Columbia Greenway Rail Trail is a multi use recreational trail in Westfield MA which, when completed, will join the City of Westfield with the Southwick Rail Trail and the Farmington Valley Greenway in Connecticut. Eventually, the trail will extend northward from the Westfield River to connect to the Manhan Rail Trail in Southampton and Easthampton and the Norwottuck Rail Trail in Northampton. E.T.& L. Corp. completed the South Portion Phase 2 work in October 2014 and has now been…
The Town of Sudbury awarded a $2.1 million contract to E.T.& L. Corp. to improve the important intersection of Hudson Road, Old Sudbury Road (Route 27) and Concord Road in the picturesque historic Sudbury Center District. This project was designed to improve traffic flow as well as vehicular and pedestrian safety while maintaining the quaint charm of this town center location. The work of this project includes installation of new ornamental traffic signals at the intersection, roadway…
In August 2014, the City of Marlborough, aided by a MassWorks Infrastructure Grant, awarded E.T.& L. Corp. a $3.2 million contract for the reconstruction of Simarano Drive, a vital roadway in the city’s southwest corner. The Simarano Drive area is home to many businesses, including Quest Diagnostics, TJX Companies corporate headquarters, as well as a mixed-use development which includes an apartment complex, restaurants, retail space and a Hilton Garden Inn. The work of this project…
In 1929, the Daughters of the American Revolution (D.A.R.) donated 1,020 acres to the Commonwealth for a state forest in Goshen, MA. Since then, more than 750 additional acres have been acquired to include Upper and Lower Highland Lakes, which offer a popular swimming beach, camp sites, a shady picnic area and a group picnic pavilion. (1) In March 2015, the Massachusetts Department of Conservation and Recreation (DCR) awarded E.T.& L. Corp. a $2.28 million contract for the rehabilitation…
Under a $960,000 contract with the Montague Airport Commission, E.T.& L. Corp. will be undertaking an improvement project at the Turners Falls Municipal Airport. Construction work is anticipated to begin in the Spring of 2015 and is scheduled to be complete in a short 35 days. The work consists of the full depth (32 inches) reconstruction of a portion of Parallel Taxiway ‘A’ along with drainage improvements, taxiway lighting, signage and installation of a new rotating light beacon, fencing…
Nashoba Road in Littleton MA will be reconstructed from its intersection with Nagog Hill Road down to Route 2A at the Acton town line by E.T.& L. Corp. for the Town of Littleton under a $1.5 million contract. Full depth reconstruction of approximately 5,900 feet of road, removal of all existing pavement and existing drainage culverts are part of the work. Special borrow and gravel are being installed along with subdrain at various locations where ground water is also an issue. The re-…
In February 2014, E.T.& L. Corp. was awarded Phase II of the Holyoke Canal Walk project by the Massachusetts Department of Transportation. The Canal Walk is a 9,000 foot long pedestrian walkway along the First and Second Level Canals in the center of the Canal Arts & Industry District in historic downtown Holyoke. Phase II is approximately 3,000 feet and extends the first phase canal walk along Race Street between Dwight Street and Appleton Street and includes converting the existing…
E.T.& L. Corp. will be undertaking Phase IV of a four phase project at the New Bedford Regional Airport; construction work is anticipated to begin in the Spring of 2014 and is scheduled to end in the Fall of 2014. The contract work consists of the reconstruction of Runway 5-23 along with its associated runway/ taxiway intersections, including: pavement milling and reclamation, full depth runway extensions, drainage improvements, runway lighting and signage, NAVAID improvements, and runway…
This project in the Town of Lancaster, Massachusetts consists of improvements at the Five Corners Intersection (High Street Extension / Bolton Road (Route 110) / Center Bridge Road / Old Common Road / South Bolton Road). South Bolton Road will be relocated to Center Bridge Road approximately 450 feet north of the Five Corners Intersection, thus removing one leg of the intersection. The project includes cold planning and overlay, full depth construction, water line improvements, signage,…
In February 2014, E. T. & L. Corp was awarded the Green River Covered Bridge Rehabilitation contract with the Town of Greenfield, MA. The existing bridge was rebuilt in 1972 and recently suffered significant damages from Hurricane Irene in August 2011. The bridge is a wooden covered bridge founded on a concrete abutment on the east side and a field stone abutment on the west side. The project will begin with the removal of the existing bridge structure using two 300-ton hydraulic cranes.…
The Columbia Greenway Rail Trail is a multi use recreational trail in Westfield MA which, when completed, will join the City of Westfield with the Southwick Rail Trail and the Farmington Valley Greenway in Connecticut.   Eventually, the trail will extend northward from the Westfield River to connect to the Manhan Rail Trail in Southampton and Easthampton and the Norwottuck Rail Trail in Northampton. Phase II work consists of the construction of 5,125 feet of ten to twelve foot wide…
In December 2013, E. T. & L. Corp was awarded the Wickham Hill Water Storage Basin Improvement contract by The MDC.  Located in East Hartford, the Wickham Hill facility is part of the MDC’s system that provides drinking water to 400,000 customers in the Greater Hartford area.  The facility consists of two underground storage basins with a combined capacity of 4.5 million gallons. The project includes structural, mechanical and electrical improvements to the basins and the ancillary…