As you travel around New England you’ll see hundreds of projects E.T.& L. Corp. has completed. We often feel a bit of nostalgia for the places we’ve worked and people we’ve met along the way. Here’s a small sampling of those past projects.

 
Spring of 2018, E.T.& L. Corp. was awarded a $600,000 job in Southwick, MA to replace the Shurtleff Brook Bridge on North Loomis Street. The bridge, which was originally constructed in or around 1914, was found to have several deficiencies at the time of its most recent inspection, and will be replaced with a new bridge that will meet federal and state guidelines. The new bridge will accommodate 2-way vehicular traffic, with shoulders for pedestrian and bicycle traffic. The bridge…
E.T.& L. Corp. has been subcontracted to perform sitework for a new gas company training facility in Shrewsbury. The contract, totaling $5 million, includes clearing and grubbing of the area, stripping topsoil, site cuts and fills of 180,000 cy, rip rap slope stabilization, furnishing and installing gravel for sidewalks and bituminous paving base, and furnishing and installing the site drainage system and concrete curb. Construction of the training center's foundation will begin in April…
In September of 2016, E.T.& L. Corp. was awarded a $1.6 million contract by the City of Northampton. The contract is for the reconstruction of the River Road retaining wall and a portion of the supported roadway. River Road runs adjacent to Mill River and contains the Town of Williamsburg's sanitary sewer interceptor line. The project includes demolition of the existing retaining wall and roadway, construction of a new storm drainage system, construction of a new cast-in-place reinforced…
In September of 2016, E.T.& L. Corp. was the low bidder on a major site project in Marlborough, MA. The $11,000,000.00 project for Walker Realty, LLC is to prepare the site for the construction of the Apex Center, a state-of-the-art entertainment complex. Preparation of the site for construction includes installation of a sewer system, water system, excavation and backfill for both electric and gas lines, pavement of roadway, parking, and sidewalks, and excavation and backfill of building…
The Columbia Greenway Rail Trail is a multi use recreational trail in Westfield MA which, when completed, will join the City of Westfield with the Southwick Rail Trail and the Farmington Valley Greenway in Connecticut. Eventually, the trail will extend northward from the Westfield River to connect to the Manhan Rail Trail in Southampton and Easthampton and the Norwottuck Rail Trail in Northampton. E.T.& L. Corp. completed the South Portion Phase 2 work in October 2014 and has now been…
The Town of Sudbury awarded a $2.1 million contract to E.T.& L. Corp. to improve the important intersection of Hudson Road, Old Sudbury Road (Route 27) and Concord Road in the picturesque historic Sudbury Center District. This project was designed to improve traffic flow as well as vehicular and pedestrian safety while maintaining the quaint charm of this town center location. The work of this project includes installation of new ornamental traffic signals at the intersection, roadway…
In August 2014, the City of Marlborough, aided by a MassWorks Infrastructure Grant, awarded E.T.& L. Corp. a $3.2 million contract for the reconstruction of Simarano Drive, a vital roadway in the city’s southwest corner. The Simarano Drive area is home to many businesses, including Quest Diagnostics, TJX Companies corporate headquarters, as well as a mixed-use development which includes an apartment complex, restaurants, retail space and a Hilton Garden Inn. The work of this project…
In 1929, the Daughters of the American Revolution (D.A.R.) donated 1,020 acres to the Commonwealth for a state forest in Goshen, MA. Since then, more than 750 additional acres have been acquired to include Upper and Lower Highland Lakes, which offer a popular swimming beach, camp sites, a shady picnic area and a group picnic pavilion. (1) In March 2015, the Massachusetts Department of Conservation and Recreation (DCR) awarded E.T.& L. Corp. a $2.28 million contract for the rehabilitation…
Under a $960,000 contract with the Montague Airport Commission, E.T.& L. Corp. will be undertaking an improvement project at the Turners Falls Municipal Airport. Construction work is anticipated to begin in the Spring of 2015 and is scheduled to be complete in a short 35 days. The work consists of the full depth (32 inches) reconstruction of a portion of Parallel Taxiway ‘A’ along with drainage improvements, taxiway lighting, signage and installation of a new rotating light beacon, fencing…
Nashoba Road in Littleton MA will be reconstructed from its intersection with Nagog Hill Road down to Route 2A at the Acton town line by E.T.& L. Corp. for the Town of Littleton under a $1.5 million contract. Full depth reconstruction of approximately 5,900 feet of road, removal of all existing pavement and existing drainage culverts are part of the work. Special borrow and gravel are being installed along with subdrain at various locations where ground water is also an issue. The re-…
In February 2014, E.T.& L. Corp. was awarded Phase II of the Holyoke Canal Walk project by the Massachusetts Department of Transportation. The Canal Walk is a 9,000 foot long pedestrian walkway along the First and Second Level Canals in the center of the Canal Arts & Industry District in historic downtown Holyoke. Phase II is approximately 3,000 feet and extends the first phase canal walk along Race Street between Dwight Street and Appleton Street and includes converting the existing…
E.T.& L. Corp. will be undertaking Phase IV of a four phase project at the New Bedford Regional Airport; construction work is anticipated to begin in the Spring of 2014 and is scheduled to end in the Fall of 2014. The contract work consists of the reconstruction of Runway 5-23 along with its associated runway/ taxiway intersections, including: pavement milling and reclamation, full depth runway extensions, drainage improvements, runway lighting and signage, NAVAID improvements, and runway…
This project in the Town of Lancaster, Massachusetts consists of improvements at the Five Corners Intersection (High Street Extension / Bolton Road (Route 110) / Center Bridge Road / Old Common Road / South Bolton Road). South Bolton Road will be relocated to Center Bridge Road approximately 450 feet north of the Five Corners Intersection, thus removing one leg of the intersection. The project includes cold planning and overlay, full depth construction, water line improvements, signage,…
In February 2014, E. T. & L. Corp was awarded the Green River Covered Bridge Rehabilitation contract with the Town of Greenfield, MA. The existing bridge was rebuilt in 1972 and recently suffered significant damages from Hurricane Irene in August 2011. The bridge is a wooden covered bridge founded on a concrete abutment on the east side and a field stone abutment on the west side. The project will begin with the removal of the existing bridge structure using two 300-ton hydraulic cranes.…
The Columbia Greenway Rail Trail is a multi use recreational trail in Westfield MA which, when completed, will join the City of Westfield with the Southwick Rail Trail and the Farmington Valley Greenway in Connecticut.   Eventually, the trail will extend northward from the Westfield River to connect to the Manhan Rail Trail in Southampton and Easthampton and the Norwottuck Rail Trail in Northampton. Phase II work consists of the construction of 5,125 feet of ten to twelve foot wide…
In December 2013, E. T. & L. Corp was awarded the Wickham Hill Water Storage Basin Improvement contract by The MDC.  Located in East Hartford, the Wickham Hill facility is part of the MDC’s system that provides drinking water to 400,000 customers in the Greater Hartford area.  The facility consists of two underground storage basins with a combined capacity of 4.5 million gallons. The project includes structural, mechanical and electrical improvements to the basins and the ancillary…
The Connecticut Department of Transportation awarded E.T.& L. Corp. this $4.5 million bridge replacement contract in June 2013.  The project consists of the replacement of two existing bridges over the Succor Brook on Route 82 in the Town of East Haddam, CT.  The bridges are being replaced with precast concrete rigid frame structures on cast-in-place concrete foundations.  Preparatory work began in the fall of 2013; the major work will start in the spring of 2014 when Route 82 will be…
E.T. & L. Corp. was awarded the Hartford Landfill contract by the Connecticut Resources Recovery Authority in June 2013. The project requires a 35 acre closure turf cap over the existing landfill, drainage improvements, a supplemental gas system, and the installation of a 1 megawatt photovoltaic system.  The closure turf cap is a two-part system that consists of the installation of a 50 mil spiked HDPE liner and an artificial turf surface. The solar panel array will be installed on the new…
E.T.&L. Corp was awarded the MassDOT contract for the replacement of the bridge spanning the Lawrence River on Northeast Fitzwilliam Road. Work for this contract includes the replacement of the existing steel girder bridge with a precast arch bridge. The existing bridge superstructure will be completely demolished, followed by the partial demolition of the existing stone masonry abutments to provide room for the cast-in-place abutment footings and stems. This will be followed by the…
Fitch’s Bridge over the Nashua River, in the Town of Groton, MA, was built in 1898 by the Berlin Iron Bridge Company (Berlin, CT) and was shipped to its current location. The 126 foot long double-intersection Warren Truss bridge was used by pedestrians and vehicles for over 65 years until it was closed to traffic in the mid 1960’s due to heavy deterioration. E.T.& L. Corp. was contracted by the Town of Groton to demolish the existing bridge and install a new pre-fabricated steel truss…