East Brookfield - Shore Road Bridge

In March 2012, E.T. & L. Corp. was awarded the East Brookfield Shore Road bridge replacement project by MassDOT. The Shore Road Bridge at the Quaboag Pond was in need of repair.

The existing steel structure was fully removed in a single phase. A new integral abutment bridge with precast pre-stressed concrete box beams on cast in place abutments was constructed to replace the existing structure. The new abutments sit on five HP 12x84 steel piles driven to bedrock.

Shore Road was reconstructed on either side of the bridge. The roadway reopened, as scheduled, on November 7, 2012.