Haddam Connecticut Landfill

In December 2011, the Town of Haddam, Connecticut awarded E.T.& L. Corp. the Landfill Closure & Transfer Station Construction project. The awarded contract for $2.1 million requires construction of a new transfer station over the existing landfill, and the subsequent closure of the adjacent old transfer station. The new transfer station includes a 3.3 acre cap over the existing landfill, installation of a 36 foot by 24 foot pre-engineered building, and the erection of a 225 foot by 40 foot steel canopy atop a 1,760 square foot precast retaining T-wall. As required, the transfer station has remained fully operational during construction. The project was completed in the summer of 2012.