In June 2012, the Connecticut Metropolitan District Commission (MDC) awarded E.T.& L. Corp. a $2.6 million contract for the rehabilitation of the West Hartford Reservoir No. 2 Dam and Dikes. The rehabilitation project provided improvements that address safety deficiencies, reduce risks to downstream communities and natural resources, and improve the life expectancy of the dam structures. The five major components of the 237 acre reservoir – the 1,425 foot long Main Dam, Spillway, North Dike, Division Dike and South Dike – were all addressed.

A temporary cofferdam was constructed to allow repairs and the replacement of the Main Dam mid level and low level outlet works, including new intakes, outlets and upstream and downstream gates and gatehouses. Sediment, erosion and seepage control measures were used to protect the reservoir and downstream areas. The spillway and dikes were stabilized with new riprap and erosion protection on upstream and downstream sides, and unacceptable vegetation was removed.

Since the roadways and walking trails throughout the MDC area are heavily used by pedestrians, detour signs and extensive safety measures were employed to maintain safe access for park users during the project.

Include In Your Next Bid