WALTHAM – Wayside Trail
One
One
One
One
One
One
One
One
One
One
One
One
One
One
One

Location: WALTHAM, MA

The Demolition and Construction of the Wayside Trail Project in Waltham, MA consisted of altering approximately 2.75 miles of an abandoned section of MBTA railroad tracks and constructing a shared use path for pedestrian and bicycle use. The project abutted a completed section of shared use path near the Weston Town Line and continued east to the Belmont Town Line. This segment of path is now a part of the Department of Conservation and Recreation’s Mass Central Rail Trail which will be a 104-mile long shared use path connecting Boston, MA to Northampton, MA. The project’s scope of work included clearing and grubbing, steel rail and timber tie removal, earthwork cuts and fills, signalized intersections, timber bridge and culvert demolition/ construction, geosynthetic reinforced soil (GRS) walls, precast concrete retaining walls with drilled shafts, landscaping, timber rail fencing, and site furnishings. The project was completed in the Spring of 2024.

Include In Your Next Bid