In the Fall of 2022, E.T. & L. Corp was low bidder on a MassDOT project in Harwich, MA for a bridge replacement on Azalea Drive. The existing single-span structure was replaced with a new single-span integral abutment spread box beam bridge. The approach roadway was widened to fit the proposed bridge cross-section and construction phasing for approximately 300 feet in each direction. Work included assembling and installing a temporary pedestrian bridge and routing pedestrians around the work zones and relocating existing underground utilities onto the temporary pedestrian bridge. Also included was construction of a portion of the new bridge consisting of Class B rock excavation, installing temporary earth support system, bridge excavation, driving steel piles, placing the reinforced concrete cast-in-place pile caps, installing the precast concrete spread box beams, placing the cast-in-place wingwalls, placing the cast-in-place bridge deck, installing Type S3-TL4 bridge railing, installing the precast highway guardrail transitions, backfilling, and installing the superpave wearing surface, as well as full-depth reconstruction of the approach roadways and construction of a new cement concrete sidewalk along one side of the road. Work on this project was completed in September of 2024.
HARWICH – Azalea Drive Bridge










In Your Next Bid